Grass planting shoulder
Catchment tank: bottom width 40 cm high 16 cm
Due to the encroachment of the original grass-planting shoulder on the road surface, the drainage on both sides is not smooth, and the phenomenon of water and ice on the road surface is widespread.
Past vehicles bring some potential accidents. Therefore, Suhuai Salt Maintenance Department and our company jointly created, using sliding form paving construction.
Technology. First milling and then spreading, construction is carried out in the narrow space under the waveform guardrail, once forming, shortening the construction cycle.
The construction quality is guaranteed during the construction period.